Network rack and surveillance system installation
Installation of a network rack with NVR, patch panel, and structured cabling as part of technical infrastructure delivery.
Project site — field installation · 2026
The scope included preparing and mounting a network equipment rack, installing a network video recorder (NVR), terminating a patch panel, and preparing keystone outlets for expansion. The photo documents the on-site installation stage before final cabinet closure.

